Sunday, March 8, 2009

Re-Intering of Ancient Chamorro Remains at the Fiesta Hotel

On January 30th, 2009 the remains of 88 Ancient Chamorros which were discovered and unearthed during the remodeling of the Fiesta Hotel in Tumon were re-interned at a small monument near the hotel's parking lot. A ceremony was held in their honor, asking forgiveness for the desecration and also to honor them in their reburial.







Saturday, January 17, 2009

Petition to Protect Dandan

Please consider signing the petition below titled "To Prevent the Construction of a Mounded Landfill on top of Inarajan Watershed at Layon, in Dandan, Municipality of Inarajan." The full text of the petition is pasted below, but you can click here to sign it online.

*********************************

To: Attorney General of the U.S. & Department of Justice
A PETITION:
TO URGENTLY REQUEST THAT THE ATTORNEY GENERAL OF THE UNITED STATES AND THE DEPARTMENT OF JUSTICE IMMEDIATELY STOP ANY AND ALL FURTHER ACTION RELATIVE TO THE CONSTRUCTION OF A LANDFILL ABOVE THE INARAJAN WATERSHET AT LAYON, IN DANDAN, MUNICIPALITY OF INARAJAN, UNITED STATES TERRITORY OF GUAM BASED ON THE ENUMERATED STATEMENTS OF FACT APPENDED HEREIN;

AND

TO URGENTLY REQUEST THAT THE ATTORNEY GENERAL OF THE UNITED STATES AND THE U.S. DEPARTMENT OF JUSTICE IMMEDIATELY INVESTIGATE INAPPROPRIATE ACTIONS TAKEN OR PERMITTED BY THE U.S. DISTRICT COURT, THE U.S. ATTORNEY’S OFFICE IN GUAM, AND THE U.S. ENVIRONMENTAL PROTECTION AGENCY-REGION NINE, RELATIVE TO FAILURE TO FOLLOW CONSENT DECREE REQUIREMENTS AND INTERFERING WITH AND IMPEDING THE ESTABLISHED STATUATORY PROCESS FOR PRIVATE ENTERPRISE TO DEVELOP A LANDFILL IN GUAM.

By affixing their signature to this petition, each of the undersigned petitioners agrees with and supports the following statements of fact relative to requesting a halt to any action relative to construction of a landfill above the Inarajan Watershed at Layon, in Dandan, Municipality of Inarajan, United States Territory of Guam:

1. ENDANGERMENT OF WATER RESOURCES.
The area in and around the selected landfill site has a number of rivers and tributaries flowing through it, all part of Inarajan Watershed. According to “Assessment of Viability of Ground Water and Surface Water Resources for the Guam Waterworks Authority Water Resources Master Plan” dated December, 2004, reservoirs placed at the Inarajan and Tinaga Rivers could produce a sustainable flow of nearly 8 million gallons of fresh water per day, enough to provide for 23% of Guam’s residents.

Chief Hydrogeologist Martin G. Steinpress of environmental engineers and consultants Brown and Caldwell (B&C) wrote the following to the General Manager of Guam Waterworks Authority.

(a) “Although GWA’s Fena surface water reservoir and Ugum diversion currently supply southern Guam, future needs may require groundwater development. Since groundwater beneath Layon falls within the G-1 Resource Zone category, it must be protected to drinking water quality standards.”

(b) “The SEIS acknowledges that the Inarajan River has been identified as potential site for a surface water dam and/or reservoir. SEIS Figure 3-1 also shows proposed reservoir and/or diversion sites on the Tinago River…both of these proposed sites would be downstream of the proposed landfill site.”

(c) “In spite of the SEIS claim that “no plans are currently in place to develop groundwater or surface water supplies in the Layon Area…GWA considers (the Inarajan and Tinago Rivers) as potentially viable and necessary for the future water supply needs. In fact, the pre-draft Guam Water Budget Report…recommends that consideration be given to investigating the feasibility of diversions at other rivers in addition to the Ugam…”

A landfill located in this area could potentially endanger a valuable source of fresh water for Guam’s future growth and development. Placing the landfill over this precious natural resource would be as foolish as placing the landfill over Guam’s northern aquifer.

2. VIOLATIONS OF EXISTING PUBLIC LAWS. THE CONSENT DECREE REQUIRES THAT ALL LOCAL LAWS BE FOLLOWED.

(a) Public Law 23-95, enacted in 1996, and amended in 2008 by Public Law 29-116 clearly identifies the exact location for the sanitary landfill, Parcel B of Lot No. 439-R1, Guatali, Santa Rita, Guam. This law has not been amended or repealed to change the designated site for the landfill and the Legislature has reaffirmed, in P.L. 29-116, that the Guatali site is the only authorized site for a landfill in Guam. The Consent Decree (CV-02-00022) requires that all local laws be followed.

(b) Guam EPA and Public Works violated the site selection process required by the Consent Decree (CV-02-00022), by selecting only a single final site instead of three (3) final sites as required. The Sabanan Batea and Lomfit sites that were listed with Layon/Dandan by Guam EPA and Public Works were never eligible to be considered as landfill sites.

(c) The 2006 Solid Waste Management Plan (SWMP) designating the Layon/Dandan site is invalid. Only the Legislature is authorized to designate Guam’s landfill site. The Consent Decree requires that all local laws be followed.

(d) The 2006 SWMP which requires an Economic Impact Statement (EIS), for all costs to the public of over Five Hundred Thousand Dollars ($500,000) did not include an Economic Impact Statement, but did contain a certification by the Guam EPA administrator that it would not cost the general public in excess of $500,000. The estimated cost of the landfill alone is approximately $190 Million.

(e) Guam law requires the Administration to produce an EIS in the year following its submission if one does not accompany the SWMP. No EIS has been produced to date, in violation of local law. The Consent Decree requires that all local laws be followed.

3. IMPROPER ATTEMPTS BY U.S. EPA AND THE U.S. ATTORNEY TO VIOLATE THE INTENT OF THE CONSENT DECREE AND TO BLOCK FREE ENTERPRISE IN GUAM.

(a) An email, dated November 29, 2007, from Pankaj Arora of U.S. EPA – Region 9, Superfund Division in San Francisco, CA, to the Administrator and staff of Guam EPA, who hold the responsibility of reviewing permit applications to build a privately owned landfill, is evidence of U.S. EPA’s determination to block free enterprise. These Federal entities have placed pressure on Guam EPA to keep a private company from starting a legitimate business so that the Federal government can force the Government of Guam to build a landfill in an inappropriate site. The subject line of the email is “Review of Guatali documents,” and the email states in part:
“I would like to re-emphasize one issue that has been on the table for a few weeks now. According to USEPA (U.S. Govt.) Dandan is the selected site for the new landfill. The Dandan site was proposed by GovGuam under the Consent Decree and accepted by the US as part of the Consent Decree. Therefore, there should not be any confusion about the Dandan site being the new landfill site.

“Last week, I was surprised to see that a permit application was submitted to Guam EPA for the Guatali site. The permit application ties the Guatali site to the Consent decree. This is unacceptable to the US. As stated earlier, Dandan is the site for the new landfill that was proposed by GovGuam and accepted by the US. Please ensure that Guam EPA is working under the guidelines and requirements of the Consent Decree.”

(b) Attached to Mr. Arora’s email was an email from Mikel W. Schwab, US Attorney, Civil chief, U.S. Attorney’s Office, Guam & the NMI, U.S. Department of Justice, to instruct Guam EPA. In part it reads as follows:
“Pankaj,
“It has to be understood that there is no more debate about where the site will be. To comply with the Consent Decree the site chosen, Dan Dan, must remain the focus of all efforts.”
“If the Government of Guam wants to pursue a ‘waste to energy’ scheme, they are free to do so. But, that has nothing to do with, and cannot distract from, their obligation under Federal Court Order to open the landfill at Dandan.”
“If anyone is attempting to go back to the debate and search phase about where the landfill should be placed, they are in defiance of the Consent Decree. They are also indulging in the malady that has led us to this problem. A correct and proper decision has been made and it will be enforced by the Federal Court.”
“Dandan is the location of the new landfill that the Government of Guam must build.”

Through these e-mails, and perhaps through other e-mails and by other means, the U.S. EPA and U.S. Attorney have instructed Guam EPA to deprive a private business of its right to pursue a landfill at Guatali, which violates Section 10(b) of the Consent Decree that states:
“…upon the opening of a properly licensed and permitted municipal solid waste
landfill…no further dumping of any kind will be permitted at the Ordot Dump.”
This does NOT state that it must be a Government of Guam municipal solid waste landfill. In fact, nothing in the Consent Decree states that the landfill CANNOT be privately owned.

These actions are also a violation of several Guam public laws, including P.L. 23-95 and P.L. 29-116. The Consent Decree (CV-02-00022) requires that all local laws be followed.

4. PROHIBITIVBELY ENORMOUS COSTS TO THE PEOPLE OF GUAM.
In addition to the extremely expensive landfill that is required to be constructed over an important source of fresh water, a landfill at Layon/Dandan will place an incredible strain on infrastructure designed for rural traffic on a tropical island, not heavy industrial traffic as a landfill will require. Less than 10% of Guam’s population travels on Inarajan’s scenic primary and secondary roadways on a daily basis, and the roads are woefully inadequate to support the increase in volume of traffic and weight of the vehicles that will need to have access to a landfill at Layon/Dandan on a daily basis. Virtually all roads are two lanes, one in each direction. Shoulders are often non-existent, and bridges are unsuitable for a constant flow of heavy trucks and equipment. The massive infrastructure upgrades necessary to replace bridges, install traffic signals, acquire easements to widen and improve roadways and turning lanes and to create new shoulders for highways from Agat south to Inarajan and Layon, and then north to Yona, including the Cross Island Road, in order to accommodate the massive increase in volume of traffic solid waste is transported from all over the island, and from the military bases, to the site, will cost Guam’s people many hundreds of millions of dollars.

5. HARMING SOUTHERN GUAM AS A TOURIST DESTINATION AND ATTRACTION.
Tourism is Guam’s most important industry. Southern Guam is one of our island’s greatest tourist attractions. The south is the most picturesque area of our island and the lifestyle in the south still portrays much of the traditional Chamorro culture, as compared to the very urbanized lifestyle in northern Guam. Much of what makes the south unique and attractive would be lost with the establishment of a landfill that is visited daily by dozens of heavy, foul-smelling garbage trucks on formerly scenic and charming roads and bridges that have been “modernized” into steel, concrete and asphalt monoliths to accommodate the landfill.

Sincerely,

Friday, December 12, 2008

Huntan Manamoru Mina'dos

"Mina'dos na Huntan Manamoru: Huntan i Manamoru ni' Pumetsisigi Dinitetminan Maisa." In these videoes we see Dr. Lisa Natividad and Senator Ben Pangelinan speaking at the Chamoru Summit II, held on October 25, 2008 at the University of Guam Lecture Hall. Dr. Natividad was one the organizers for the event and Senator Pangelinan is the chair for the committee responsible for revitalizing the decolonization registry on island.



Friday, October 10, 2008

UN Report Back: Chamorro Delegation to the United Nations

On October 7th a delegation of Chamorros testified before the United Nations Special Political and Decolonization Committee (Fourth Committee) in New York City on the question of Guam's continued colonial status.

The delegates discussed the cumulative adverse impacts of US colonization and the current military build-up, highlighting such issues as environmental contamination, Chamorro displacement, alarming cancer rates, and the infrastructural strains expected from the island's unprecedented population boom - which will make the Chamorro people a minority group in our homeland. JOIN US FOR AN EVENING OF CULTURAL PRESENTATIONS AND DISCUSSION:

Saturday, November 15, 2008
7:00 pm

$5-20 donation (no one turned away)

BRAVA Theatre
2781-24th Street
San Francisco, CA 94110

For more information, contact famoksaiyan.jon@gmail.com or call 510.612.0195

SAVE THE DATE!!!!!!

Sunday, September 14, 2008

The Need for Progressive Solutions to the Challenges that Guam is Facing

20 years of growth in 5:
Guam population will add 42,000 by 2013
By Gaynor Dumat-ol Daleno
Pacific Sunday News
September 14, 2008

During rush-hour traffic in Dededo, Tamuning and Tumon, cars often move at barely a crawl in bottleneck areas...

That's Guam today, with its population estimated at close to 173,000.

Add more than 42,000 people to that figure five years from now, according to data from a draft transportation plan.

"Guam will experience 20 years of population growth in just five years with the military buildup," the 2030 Guam Transportation Plan states.

The plan, which takes into account the U.S. military buildup, outlines massive projects that include widening and building new roads for civilian as well as military needs. The plan includes a mass transit system that would work for a lot more people than its current small pool of riders.

The military buildup has been projected to cost as much as $15 billion, and would include: relocating thousands of U.S. Marines and their families from Okinawa; expanding the Navy and Air Force bases; and building an Army ballistic missile defense facility.

By 2015, when the military buildup is expected to be complete, Guam's population will top 231,000, according to the report. Without the military buildup, it would take Guam at least two decades to reach that level of population growth.

The Department of Public Works plan proposes seeking a combination of funds from the Department of Defense, the Federal Highway Administration and other pockets within the federal government.

Some members of the community have voiced a mix of optimism and concern regarding the growth.

Preparation
John M. Lee, who owns a Shell service station along Route 3, in the general area of the preferred site for a Marine base, said he welcomes the anticipated growth.

"Wow," was Lee's initial comment when he heard of the population growth projection.

A larger population means more opportunities for entrepreneurs such as Lee, who's also opening popular Japanese pastry shop Beard Papa's at Guam Premier Outlets.

But, at the same time, Lee would like to see Guam -- as a community -- prepare better to handle the projected growth. He offered the analogy of would-be parents who must learn parenting skills as best as they can before having children.

"If we are going to expect that," he said of the population surge, "we must do our homework."

And that homework, he said, includes establishing social safety nets and a system that makes sure quality of life for those who already call Guam home doesn't suffer.

Potential strain
Economist Joseph Bradley said the bottom line is that, yes, Guam can handle the projected growth.

"After all, we did so during World War II, and again during the Vietnam War," said Bradley, a senior vice president at the Bank of Guam.

Defense Department representatives have called the proposed buildup the biggest military move in Guam since World War II.

The host community, Bradley said, won't like the potential strain of that growth -- crowding, traffic congestion, sewer overflows and water shortages.

"Unless we make some rather enormous moves now, today -- which we should have made last year, or the year before -- if we don't do whatever we can in the civilian community to prepare for what we know is coming, we will come nowhere close to optimizing the benefits that we might still receive," Bradley said.

"It is time to make the tough decisions and take the aggressive actions that are needed for the prospective growth and prosperity of Guam. Given the global economic situation, we can't afford to wait," Bradley said.

Housing
Part of the challenge when 20 years of growth is compressed into five years is whether there will be enough homes for all the newcomers.

Between 1990 and 2000, Guam has seen a population growth rate of 14 percent.

In five years, if the plan's projection is correct, the number of people on Guam will surge about 24 percent -- that means one additional person for every four people who currently live on Guam.

There's no reason to doubt the population growth projection in the transportation plan, states SMS Research and Marketing Inc., a Honolulu research partner for PCR Environmental Inc. PCR has been selected to conduct a housing study for the government of Guam.

Accommodating a population of 215,000 by 2013 would require housing construction rates on Guam to increase by 40 percent to 50 percent, according to SMS.

"If ... the 215,000 projection is used, and there is no change in the housing production rate, Guam would need an additional 5,573 new units, or almost 1,115 units per year, between 2008 and 2013," SMS officials said.

Contrasting markets
The military buildup puts Guam's economic outlook in stark contrast with the gloom engulfing the housing market in the U.S. mainland.

In most of the nation, the number of new homes being built has fallen to lows not seen in decades, while home purchases have seen double-digit drops, according to wire news service reports.

In contrast, Guam faces an overall construction boom that's in the billions of dollars for both private-sector and military projects.

Based on the 2015 population projection, Guam would need about 7,500 more civilian housing units, said Nick Captain, president of Captain Real Estate. His company tracks local housing data.

The military also is expected to build houses within the proposed Marine base in the Finegayan area on Route 3. About 8,000 Marines and their 9,000 dependents are expected to move to Guam.

The bulk of the military buildup construction is expected to start in 2010 -- if the military receives all the environmental clearances it needs by early next year.

During the buildup's construction phase, 12,000 to as many as 20,000 additional construction workers are expected to be needed on Guam, and their count is included in the 2015 population projection.

The military, in an industry forum on Guam earlier this year, floated the idea of Olympic-village-style housing for the temporary workers. The worker housing could be converted into low-cost housing for Guam residents when the projects are completed, according to initial discussions between the local government and Defense Department representatives.

Captain emphasized that Guam is in a unique position of being perhaps the only U.S. location with guaranteed and significant major boost in population and economic growth within the next several years.

"Guam is looking at a phenomenal period of population and economic growth over the next five years, and there will be good and bad accompanying that growth," Captain said. "It is a phenomenal growth."

Guam currently has about 26,500 stand-alone housing units and approximately 5,000 condominium units, according to Captain's estimates. The vacancy rate for the stand-alone houses, or single-family dwellings, is around 10 percent at this time, he estimated.

"If we play our cards right, and the government makes good decisions, the quality of life will increase," Captain said.

Developing social safety nets for local residents is key to helping Guam residents as the island transforms into a much bigger community, Captain said.